Phase 4 Construction Underway

The Contractor has shifted traffic into the Phase 4 configuration from Willamette Drive to the SR 1 interchange. Two lanes of traffic are open in each direction along SR 72. Expect periodic single lane closures along SR 72 through the Spring of 2025.